Melbourne Carpark Extension

114 Flinders Street

A established existing 10 level Carpark, recently extended to 17 levels,  LJ Services were engaged to provide full Mechanical Electrical and Automation for the Carpark Ventilation and Stairwell pressurization Systems.

The Building comprises of 5 levels of Commercial office space abutting Flinders Street, existing plant was built up multi zone Chilled/Heating Hot water serving all areas, the plant was located on the level 10 roof plant which was to become new car parking areas. The existing Carpark Exhaust and Supply Fans and also the Stairwell Pressurisation Fans were also located in this area, due for demolition.

New plant for the Carpark Ventilation Systems were located on levels 15 and 17, Stairwell pressurization shafts were also extended and provided with new Supply fans and pressure controls.

In addition, 90 Fantech Jet fans were installed in accordance with the Fire Engineering report throughout new and existing car parking spaces, due to the car parks 24/7 operation, strategic traffic management and out of normal hours work was provided to allow works to proceed safely without impact on the carpark operation.

LJ Services integrated the control and monitoring of these fans, High level to the Honeywell WEBsAX Building Management System ( BMS). Minor ventilation for end of trip facilities was also controlled and Monitored, with a site graphical display and remote access and monitoring via GSM Modem, allowing servicing and fault notification remotely.

 

 